Multi-Story Volumetric Modular · Module Engineering

Multi-Story Volumetric Modular Construction & Precision Module Engineering

Elite Nexus Group specializes in the on-site engineering, heavy cranage erection, structural inter-module bolting/welding, and MEP/facade integration ('module zipping') required to turn factory-built volumetric units into permanent, monolithic multi-story buildings.

01 · Service Regions

Active Geographic Coverage

  • Riyadh
  • Jeddah
  • Eastern Province
  • Vision 2030 Project Sites across KSA

02 · Project Fit

Suitable Clients & Project Types

  • ✓Main contractors and modular factories requiring a specialist on-site installation and module-engineering partner
  • ✓Hospitality, staff accommodation, healthcare, and commercial developers using volumetric or panelized systems
  • ✓Government and institutional entities executing fast-track modular buildings

03 · Scope Demarcation

Scope of Work: What Is Included & Excluded

✓ Included in Technical Scope

  • +Foundation datum survey and cast-in steel embed plate leveling (±1.5 mm tolerance)
  • +Lifting plan, spreader-beam rigging, and multi-story volumetric module stacking
  • +Structural inter-module tension/shear connections and perimeter diaphragm tie-ins
  • +Corridor MEP riser tie-ins, fire-rated cavity barriers (SBC 801), and EPDM/silicone weather sealing
  • +Zero-seam interior mate-line closure across module joints (< 0.5 mm flush finish)

− Excluded Unless Explicitly Contracted

  • −Off-site factory manufacturing when contracted strictly as the on-site erection & zipping specialist
  • −External civil infrastructure outside the building footprint unless included in contract

04 · Execution & QA/QC Protocol

Execution Stages, Inspection Gates & Handover

STAGE 01±1.5 mm Tolerance

Podium Datum & Foundation Interface

Laser-leveled S355J2 embed plates and non-shrink structural grouting.

STAGE 02< 45 Min / Module

Cranage & Volumetric Stacking

Balanced spreader-frame lifting onto conical steel guide pins.

STAGE 03100% Torque Verified

Structural Inter-Module Connections

High-tensile bolting and shear-key locking across all four corners.

STAGE 04IP67 & 2-Hr Fire

On-Site MEP & Envelope Integration

Riser tie-ins, 2-hour intumescent fire stops, and IP67 facade sealing.

STAGE 05< 0.5 mm Flush Finish

Mate-Line Fit-Out & Commissioning

Flush drywall/flooring closure across mate-lines and full MEP testing.

05 · Cost Drivers

Key Factors That Determine Project Cost

  • •Number of volumetric modules, stories, and module dimensions/weight
  • •Site crane access, lifting radius, and night/day rigging windows
  • •Structural connection detail complexity and fire/acoustic rating requirements
  • •Extent of on-site mate-line fit-out and facade cladding scope

06 · Quotation Requirements

Information Required for an Accurate BOQ Quote

  • →Module layout drawings, weights, and connection details
  • →Site location, podium/foundation readiness, and target erection schedule
  • →Scope demarcation matrix (Factory vs. On-Site Erection vs. Fit-Out)
Submit Project Brief & Drawings →

07 · Executed Proof & Case Studies

View All construction Projects →

08 · Client Questions

Frequently Asked Questions

Can Elite Nexus work as a specialist installation contractor with international or local modular factories?

Yes. We partner with modular manufacturers and main contractors to handle the critical on-site interface: datum leveling, crane erection, structural bolting, MEP tie-ins, fire-stopping, and zero-seam interior/exterior finishing.