Modular DfMA Advisory, Sequence Engineering & Technical Project Management
Elite Nexus Group advises developers, project owners, and contractors on converting conventional architectural designs into buildable modular systems (DfMA), coordinating multi-trade interfaces, and managing site quality and tolerances.
01 · Service Regions
Active Geographic Coverage
- Riyadh
- All Regions of Saudi Arabia & GCC
02 · Project Fit
Suitable Clients & Project Types
- ✓Real estate developers evaluating modular vs. conventional construction feasibility
- ✓Architectural firms needing specialist DfMA engineering input for modular grid optimization
- ✓Project owners requiring independent technical QA/QC supervision during execution
03 · Scope Demarcation
Scope of Work: What Is Included & Excluded
✓ Included in Technical Scope
- +Architectural-to-Modular grid conversion and volumetric split optimization (DfMA)
- +Transport envelope, crane lifting radius, and site stacking sequence engineering
- +Inter-trade interface matrices (Structure, Facade, MEP, Fire, Acoustic)
- +Site QA/QC inspection checklists, tolerance verification, and programme recovery advisory
− Excluded Unless Explicitly Contracted
- −Statutory municipal AOR (Architect of Record) stamping where a separate licensed local engineering office of record is mandated by law
04 · Execution & QA/QC Protocol
Execution Stages, Inspection Gates & Handover
Feasibility & Grid Audit
Assessing structural spans, transport dimensions, and SBC compliance.
Interface & Connection Detailing
Defining structural nodes, MEP corridor tie-ins, and mate-line closures.
Execution Sequence & QA/QC Supervision
On-site datum checks, torque/pressure sign-offs, and handover verification.
05 · Cost Drivers
Key Factors That Determine Project Cost
- •Project scale, building typology (residential villa vs. multi-story hospitality/commercial)
- •Current design maturity (Concept stage vs. RIBA Stage 3/4)
- •Required level of on-site supervision and frequency of site inspections
06 · Quotation Requirements
Information Required for an Accurate BOQ Quote
- →Concept or schematic architectural drawings
- →Project location, target completion date, and brief
07 · Executed Proof & Case Studies
Related Projects & Case Studies
08 · Client Questions
Frequently Asked Questions
When is the best time to involve Elite Nexus for DfMA consultancy?
Ideally during the schematic or early design stage, before structural grids are frozen. Early DfMA alignment prevents costly redesigns and ensures module dimensions optimize both factory production and road transport in Saudi Arabia.